Sign In | Join Free | My burrillandco.com
Home > Engineering Drilling Rig >

Mining Core 380v Engineering Drilling Machine Full Hydraulic Crawler

Jinzhou City Shitan Machinery Equipment CO. LTD.
Trust Seal
Verified Supplier
Credit Check
Supplier Assessment
Contact Now
    Buy cheap Mining Core 380v Engineering Drilling Machine Full Hydraulic Crawler from wholesalers
     
    Buy cheap Mining Core 380v Engineering Drilling Machine Full Hydraulic Crawler from wholesalers
    • Buy cheap Mining Core 380v Engineering Drilling Machine Full Hydraulic Crawler from wholesalers
    • Buy cheap Mining Core 380v Engineering Drilling Machine Full Hydraulic Crawler from wholesalers

    Mining Core 380v Engineering Drilling Machine Full Hydraulic Crawler

    Ask Lasest Price
    Brand Name : JINZHOU SHITAN
    Model Number : GK-200
    Certification : ISO9001
    Price : Negotiation
    Payment Terms : T/T, Western Union
    Supply Ability : 2000 sets per year
    Delivery Time : 7-12 days
    • Product Details
    • Company Profile

    Mining Core 380v Engineering Drilling Machine Full Hydraulic Crawler

    Mining Core Drilling Machine Full Hydraulic Crawler Engineering Drilling Rig


    GK 200 Engineering Drilling Rig Introduction


    Diesel drilling machine: fast drilling speed, time-saving and labor-saving, convenient to carry, easy to operate,high quality and low price, economical and practical, it is a product in well drilling, piling and drilling equipment


    GK 200 Customized Engineering Drilling Rig Technical Data


    Drill rig specification

    Drilling depth

    200m

    Drilling Diameter

    91mm,110mm,130mm,150mm,300mm

    Drilling rod diameter

    50mm

    Drilling Angle

    90°-75°

    Dimensions(L×W×H)

    1750×850×1300 (mm)

    Weight

    880kg/set

    Swivel Head

    Spindle Speed

    115, 230, 505, 790, 1010 r/min

    Spindle stroke

    450mm

    Spindle Dia.

    Φ59mmx53mmx4350mm Kelly rod

    Upward displacement speed of drilling vertical spindle

    0.05m/s

    Downward displacement speed of drilling vertical spindle

    0.067m/s

    Spindle pull-down max

    15KN

    Spindle lifting capacity max

    25KN

    Vertical maximum output torque

    1.5KN.m

    Hoist

    Max. Lifting capacity(single rope)

    20KN.m

    Lifting rotating speed

    20; 40; 90; 168r/min

    Hoisting drum linear velocity (two levels)

    0.17; 0.35; 0.73; 1.5m/s

    Drum Diameter

    140mm

    Wire rope diameter

    9.3mm

    Wire rope capability

    40m


    GK 200 Customized Engineering Drilling Rig Features


    1.Wide range if P.R.M and well-set gears

    2.Great torque in low P.R.M, fit for coring drilling and piling hole works.

    3.Mobile cylinder installed so that the drilling machine got a free travel of 300mm, ensured easy remove of drilling stem.

    4.Easy to handle, high efficiency, oil hydraulic drive, low labour intensity.

    5.With light single cell, can be dismantled and handled easily and safely.

    6.Optimized structure, small volume, and lightweight.


    What aspects should be paid attention to in the drilling process of water well drilling rig?


    After the drill bit is drilled into the structure from the drilling platform, the central drilling tool shall be replaced in time. First, you need to clean the bottom of the hole, and then blow off the residue at the bottom of the hole. When the lifting force is sufficient to lift the drill bit, slow lifting force is good.
    During the drilling process, the drill bit was summarized, the follow-up situation of the casing was noted, the specific situation of the borehole was determined within a certain time, the borehole was kept clean in time, and the drill bit was put into the drill. You need training. During this process, forced lifting is prohibited.
    Sometimes, there will be a lot of residual rock slag at the bottom of the hole of the water well drilling rig, and the rotary part of the eccentric drill bit will be stuck by the rock slag, which will affect its gathering and production. At this time, it is necessary to convey compressed air to clean the hole again, and make the DTH hammer work for a short time, and then carry out the lifting operation of the central drilling tool again.


    Mining Core 380v Engineering Drilling Machine Full Hydraulic Crawler

    Mining Core 380v Engineering Drilling Machine Full Hydraulic CrawlerMining Core 380v Engineering Drilling Machine Full Hydraulic Crawler

    Mining Core 380v Engineering Drilling Machine Full Hydraulic Crawler


    Quality Mining Core 380v Engineering Drilling Machine Full Hydraulic Crawler for sale
    Inquiry Cart 0
    Send your message to this supplier
     
    *From:
    *To: Jinzhou City Shitan Machinery Equipment CO. LTD.
    *Subject:
    *Message:
    Characters Remaining: (0/3000)